Active Grants for the Interoperability Lab department

Grant Name Close Date
1588 Precision Clock Synchronization Protocol for Networked Measurement and Control Systems 12/31/2023
ADSL 12/31/2023
AVB-Audio Video Bridging 12/31/2023
Bridge Functions 12/31/2023
Fast Ethernet 12/31/2023
Fibre Channel 12/31/2023
IOL Equipment Fund 8/28/2022
IOL Investments 6/30/2028
IOL Software Development 7/31/2022
InterOperability Lab 12/31/2023
Internet Protocol Version 6 1/8/2024
MAPS Networking Protocol Consulting Project 7/8/2023
Mobile Industry Processor Interface 12/31/2023
NVMe 12/31/2021
NVMe Over Fabrics 5/7/2023
OPNFV 7/31/2022
Power Over DTE 6/30/2023
Serial Attached SCSI 5/1/2023
Time Sensitive Networks 7/31/2022
Viavi MLTT Support Project 7/31/2022
Wireless Networks 12/31/2023